FOB Price
Get Latest Price150 ~ 300 / Set ( Negotiable )
|1 Set Minimum Order
Country:
China
Model No:
DB2-OTC
FOB Price:
150 ~ 300 / Set ( Negotiable )Get Latest Price
Place of Origin:
-
Price for Minimum Order:
150 per Set
Minimum Order Quantity:
1 Set
Packaging Detail:
boxed
Delivery Time:
20 days
Supplying Ability:
10000 Set per Month
Payment Type:
-
Product Group :
-
Contact Person Kevin
Qingdao, Shandong
**Funtion
Steel structure corrosion protection more than *0 years once
construction, such as Storage Tank Edge Plate, Welding Parts,
Flange, Bolt, Bridge Steel Cable.
** System Construction
1, First layer: Anti-corrosion Paste. Coated on steel structure
surface equally.
2, Second layer: Anti-corrosion Tape. Wraped from bottom to top,
and at least *0% lap joint.
3, Third layer: Protective Coating. Painted on the Tape.
**Product Description
Oxidation Tape and Covering System (OTC):
The material has good flexibility, that can smooth paste in any
shape surface, thus can be widely used in all kinds of complicated
shape of the equipment. Such as Storage Tank Edge Plate, Welding
Parts, Flange, Bolt, Bridge Steel Cable.
Application
Corrosion prevention for:
Storage Tank Edge Plate
Welding Parts
Flange, Bolt
Bridge Steel Cable
Buried Pipeline
Country: | China |
Model No: | DB2-OTC |
FOB Price: | 150 ~ 300 / Set ( Negotiable ) Get Latest Price |
Place of Origin: | - |
Price for Minimum Order: | 150 per Set |
Minimum Order Quantity: | 1 Set |
Packaging Detail: | boxed |
Delivery Time: | 20 days |
Supplying Ability: | 10000 Set per Month |
Payment Type: | - |
Product Group : | - |